Industrial and Warehouse

Wastewater Treatment 40000

Wastewater Treatment Plant 40000Project year: 2025        3,450 m² The wastewater treatment plant is designed for approximately 40,000 population equivalents. The process includes mechanical treatment, with photovoltaic support on the screening building, as well as a biological stage in a two line aeration tank. The treated water is discharged into the river through […]

Wastewater Treatment 40000 Read More »

Automated Logistics Facility Bavaria

Automated Logistics Facility, BavariaProject year: 2019      5,970 m²The planned construction project involves the erection of a modern logistics building within an existing industrial area, designed as a functional link between two existing structures and physically connected to them. The building is divided into a solid-construction basement and a single-story logistics hall on top,

Automated Logistics Facility Bavaria Read More »

Logistics Center Sonora

Logistics Center SonoraProject year: 2025      4,650 m²The project in Sonora, Mexico, is an automatic high-bay warehouse designed to optimize logistics efficiency and storage capacity through advanced automation.The facility features a high-bay storage hall equipped with automated racking systems and a conveyor network for the seamless handling of goods. The racking structure provides maximum

Logistics Center Sonora Read More »

South Germany Storage Facility

South Germany Storage FacilityYear of construction: 2025        14,000 m² The project involves the extension of production-related logistics facilities for an international industrial company at its existing site. The aim was to create additional storage and functional areas while ensuring a seamless connection to the existing buildings through a new single-storey link structure.

South Germany Storage Facility Read More »

error: too many clicks!